Evidence for design.

ACTIVA, BLC’s lightweight insulating concrete: documented results for pavement studies and the assessment of building applications.

Request the technical dossier Arrange an engineering review

Pavement insulation · documented MTQ recognition

The “proven product” status covers the evaluated mix and pavement insulation within the scope of MTQ letter GUQ-01788, dated March 19, 2015. Each structure is designed by its engineer.

MTQ letter, March 19, 2015 · PDF · FR →

A defined role in each structure

Pavements: an insulating layer

ACTIVA is assessed as an insulating layer that may replace part of the granular foundation, subject to design. The 3.9 MPa compressive result at 28 days describes the tested sample; it is neither a structural concrete rating nor the load capacity of a complete pavement.

Buildings: assess the intended assembly

Lightweight fill and insulation may be examined for renovation, floors and precasting. Loads, interfaces, moisture, fire performance and acoustic requirements must be checked for the intended assembly. Road recognition does not approve these uses.

Where the insulation sits in a pavement

  1. AsphaltThickness determined by traffic and pavement design.
  2. Granular coverProtection and load distribution; thickness to be designed.
  3. ACTIVA lightweight insulating concreteThickness to be justified by thermal and mechanical design.
  4. SubgradeBearing capacity, frost sensitivity and water conditions to be assessed.
Indicative schematic, not to scale or for construction. Interfaces, drainage, lateral frost and transitions require design. A 304.8 mm (12 in) layer is an exploratory scenario, not a universal thickness or a validated traffic capacity.

Measured results and test methods

The standards identify the methods used in the reports. These are sample results, distinct from design values and contractual project acceptance criteria.

CharacteristicMeasured resultMethod / source
Density, fresh / dry / immersed584 / 559 / 626 kg/m³CSA A23.2-6C / 11C · R1
Compression, 24 h / 28 days2.0 / 3.9 MPaCSA A23.2-9C · R1
Flexural strength at 28 days1.0 MPaCSA A23.2-8C · R1
Elastic modulus at 28 days2.53 GPaASTM C469 · R1
Freeze-thaw, 300 cyclesRelative dynamic modulus: 86.5%ASTM C666, procedure B · R1
Salt scaling, 56 cycles0.22 kg/m²NQ 2621-905 · R1
Dry thermal conductivity0.16910 W/(m·K)ASTM C518-10 · R2
Mass / volume absorption12.0% / 3.6%CSA A23.2-11C / ASTM D2842 B · R1

R1: MTQ report BC-14-128 / DB-13-47, 3 February 2015, Table 1, p. 4; batch of 15 July 2014. R2: Exova 14-06-M0326, 30 September 2014, Table 1, p. 3; measured 29 September at a mean 24.02 °C, on a different specimen.

Relative dynamic modulus is not residual compressive strength. The report considers scaling behaviour adequate within a pavement layer without direct contact with deicing salts.

The stated conductivity is for the dry condition. Drainage, in-service moisture, shrinkage and interfaces form part of design. The two absorption figures use different methods.

An identified test record

These measurements come from tests performed in 2014 and reported in 2014–2015. The September 2020 InnovAct Consulting study identifies the studied material as “ACTIVA 9” (p. 8). These historical references do not replace project-specific suitability checks and production quality control.

Parameters to establish for your study

Thermal conductivity under service moisture

No verified measured value is available in the records reviewed. The dry value must not be presented as a wet or saturated measurement. The design parameter must be justified for service moisture conditions.

Drying shrinkage and direct tensile strength

No independently verified result is presented here for these properties. The 0.020% length change during freeze–thaw testing is not a drying-shrinkage measurement. The flexural result is not direct tensile strength.

What BLC brings to the technical review

01

Available evidence

Identified reports, the MTQ letter and a summary of public results, selected for the intended use in a project-specific dossier.

02

Parameter review

Review of results, test conditions and missing inputs with the designer, including the study scope and interfaces to address.

03

Validation planning

Discussion of additional testing, suitability checks and acceptance controls to define for the project. The engineer remains responsible for design.

Public documents

Public BLC summaries. Original report references are included to support review with your team.

Additional records on request →

Illustrated pavement dossier

Three road settings, conceptual cross-sections and comparisons from the InnovAct study.

Explore BLC applications

05

Research and references

Selected international studies and reference guides inform design questions while keeping general research distinct from BLC results.

Read the overview

Prepare your engineering review.

Request the technical dossier