Project budget simulatorLicensing model · 12-inch BLC foundation
Open the simulator
BÉTON LÉGER DU CANADA

At bridge approaches, design the transitions.

BLC may be studied in approach pavements and adjoining interfaces, through a design that coordinates ground conditions, water and thermal behaviour.

Approaches and connections

Bridge approaches, pavement connections, utilities and certain fill zones are contexts for assessment. Lower mass may be useful in the load assessment, but does not guarantee the absence of settlement.

The designer examines the ground, existing fills, support conditions, differential settlement and movements between the structure and its approaches. Any BLC function is defined within that system.

Water, frost and maintenance

Flows, drains, joints and outlets must work together. Thermal treatment of adjacent pavement also requires assessment of lateral and longitudinal transitions, winter conditions and differences in exposure near the deck.

Details must preserve inspection, repair and utility access. Construction loads, staging and reopening to traffic are assessed with the project team.

A precise technical scope

The documented MTQ recognition concerns the formulation and use evaluated for pavement insulation. It is neither general fill qualification nor certification for a structural bridge application.

BLC is not presented here as a replacement for structural concrete in the deck, piers or abutments. Each adjacent use requires its own design, interfaces, testing and acceptance criteria.

Explore further

BLC

Let’s define the next step.

Discuss your project