01
Lightweight screeds and levelling fills
Levelling, covering services and filling beneath floor finishes: consider a lightweight solution based on the substrate, available thickness and intended finish.
Low density and thermal insulation are relevant wherever weight, available depth and placement conditions matter.
Fills, precasting, non-load-bearing elements and modular construction: select a suitable first use.
Four development pathways are being considered: filling solutions for remote projects, insulating precast components, lightweight non-load-bearing elements and layers for modular construction.
Select the use according to project requirements and producer capabilities. Assess weight, moisture, shrinkage, interfaces, handling, fire and acoustics for the intended product and assembly.
These are development opportunities requiring qualification, not approved products or announcements of signed partnerships.
01
Levelling, covering services and filling beneath floor finishes: consider a lightweight solution based on the substrate, available thickness and intended finish.
02
Consider lighter fills for existing floors where added weight matters. The designer checks allowable loads and the complete assembly.
03
Fill volumes and incorporate a thermal function in an assembly designed for that purpose, with suitable interfaces and moisture management.
04
Insulating cores, non-loadbearing moulded elements and custom modules: develop components with manufacturers, from design through qualification.
01
Compare the weight of the complete solution when exploring renovation, fill or precast applications.
02
Use the material’s documented low thermal conductivity in an assembly that accounts for thickness, moisture and thermal bridges.
03
Coordinate pumping, levels, openings and curing with the installer, taking site access and construction constraints into account.
Residential and multi-unit housing, retail, hotels and institutional buildings: start with the needs of the project — reducing fill weight, levelling a surface or integrating insulation.
| Topic | Available data | Building application validation |
|---|---|---|
| Density and strength | Test results for the historical formulation; methods and conditions in the technical dossier. | Verify the proposed formulation, loads, substrate and role of each layer. |
| Thermal insulation | Thermal conductivity measured on dry material. | Assess thickness, moisture, interfaces and thermal bridges in the assembly. |
| Fire, acoustics and interfaces | This dossier does not establish qualification of a building system. | Define applicable tests and requirements: fire, acoustics, adhesion, drying and finish compatibility. |
MTQ status applies only to the evaluated pavement insulation formulation and use. A building application requires separate qualification.
Review the evidenceSpecify the building type, substrate, areas, thicknesses, finishes and schedule.
Your design team defines loads and applicable thermal, acoustic and fire safety requirements.
BLC, the producer and the installer define the formulation, necessary tests, supply arrangements and site quality checks.
01
For new construction or rehabilitation, BLC may be considered as lightweight fill beneath a roof system designed for the project.
Read the overview02
Precasting offers avenues for utility infrastructure and access: non-load-bearing fills, composite components and elements that must be handled.
Read the overview