Summary of available historical tests
TestResultMethod / fileSource
Fresh density584 kg/m³CSA A23.2-6CR1
Dry / immersed density559 / 626 kg/m³CSA A23.2-11CR1
Compression at 1 / 2 / 3 days2.0 / 2.6 / 2.8 MPaCSA A23.2-9CR1
Compression at 7 / 28 / 56 days3.7 / 3.9 / 4.6 MPaCSA A23.2-9CR1
Flexure at 7 / 28 / 56 days0.9 / 1.0 / 0.9 MPaCSA A23.2-8CR1
Elastic modulus / Poisson ratio at 28 days2.53 GPa / 0.19ASTM C469R1
Fresh slump170 mmCSA A23.2-5CR1
Mass / volumetric absorption12.0 % / 3.6 %CSA A23.2-11C / ASTM D2842 BR1
Freeze–thaw: cycles / relative dynamic modulus300 / 86.5 %ASTM C666 BR1
Length change in freeze–thaw0.020 %ASTM C666 BR1
Scaling after 56 cycles with salts0.22 kg/m²NQ 2621-905R1
Dry thermal conductivity0.16910 W/(m·K)ASTM C518-10R2
Thermal resistance at 71.450 mm0.42 m²·K/WASTM C518-10R2
Compression, cylinders 5 / 7 (2013)3.3 / 3.1 MPaQualitas B16357R3
Direct tension, asphalt / concrete assembly0.23 MPaCSA A23.2-6B; LC 25-010R4

R1: July 15, 2014 trial batch, reported February 3, 2015. R2: September 29, 2014 test, 71.450 mm specimen, mean temperature 24.02 °C; dry condition identified by MTQ. R3 concerns different specimens with unspecified age and mix.

Accessible source records.

R1

MTQ · 2015 · Mechanics and durability

BC-14-128 / DB-13-47. Density, compression, flexure, modulus, absorption, freeze–thaw and scaling. Public edition: manufacturing sequence and mix sheet removed; results retained.

Open document · French PDF
R2

Exova · 2014 · Thermal transmission

Report 14-06-M0326, September 30, 2014. ASTM C518-10. Conductivity of 0.16910 W/(m·K) and resistance of 0.42 m²·K/W for the specimen tested. Original English report.

Open document · French PDF
R3

Qualitas · 2013 · Compression and deformation

File B16357, September 23, 2013. Compression of 3.3 and 3.1 MPa on two cylinders and deformation under load. This is not a drying-shrinkage test.

Open document · French PDF
R4

Qualitas · 2015 · Bonded asphalt

File 620394, report 001, July 2015. Direct tension of 0.23 MPa, with failure in the concrete. Assembly geometry and test conditions must remain part of any interpretation.

Open document · French PDF
R5

MTQ · 2015 · Recognition and scope

GUQ-01788, March 19, 2015 letter and February 5, 2015 note and clause. Proven-product recognition applies to the submitted mix and pavement insulation. It is neither a purchase commitment nor approval for every use.

Open document · French PDF
R6

Montréal · 2015 · Technical letter

Letter 15C076D dated July 29, 2015. Technical correspondence based on the MTQ dossier, allowing consideration of trial sections. Distinct from blanket acceptance of all applications.

Open document · French PDF

PDFs preserve the language and results of the source records. This English page summarises them; it is not a certified translation of the reports.

The September 2020 pavement study.

Authored by Hassan Baaj, Pejoohan Tavassoti, Goretty Dias and Giancarlo Lorena, the InnovAct Consulting study compares flexible pavement systems: a conventional reference, lightweight concrete alternatives and an XPS-panel alternative. Often referred to as the “Waterloo study”, the report identifies InnovAct Consulting as its institutional author.

01

Design and fatigue

Chaussée II and KENPAVE modelling, frost protection and mechanical responses. Sections and models remain specific to the case studied.

02

Life-cycle cost

Construction, maintenance, rehabilitation and residual value over 30 years, with discounting. Published results exclude excavation.

03

Environmental life cycle

Production, transport, construction and maintenance; road-user traffic and end of life excluded. A comparison of pavement systems.

From historical evidence to your application.

  1. Define the use

    Building or pavement, loads, water, climate, interfaces and acceptance criteria.

  2. Match the evidence

    Check correspondence between documented samples and the proposed mix.

  3. Complete qualification

    Define missing tests, suitability checks, monitoring and responsibilities.

A result to review with your engineers?

BLC can arrange a technical discussion and define terms for providing additional records.

Let’s discuss your project